Case
Study 2
Halifax Building Society, Leeds
Enable access to The
Halifax building society logo,
Iiger scaffolding was
selected to design and build the access scaffold for the sign people
to fix the sign in the existing tower at the tip of the building.
By building a tower to
the underside of the over-hanging soffit and cantilevered out and
take the tower above the roof eaves so the scaffold could be built
following the pitch of the roof to the clock tower and build access
tower around the tower. the client was very pleased with the end
result. Photo's of the job can be viewed on the right, click to enlarge.
|